Is the so-called no Rules no circle, man so, do projects also, do not have a good process, it is difficult to make good products. A lotDie-cutting processing plantIgnoring the importance of process management, in fact, whether large companies or small companies need a sound process to guide, in order to make customers satisfied with the market needs of the product.

There are manyDie-cutting processing plantThe development of products, in accordance with the individual subjective will, or the will of a decision-making person to carry out, the end of the production of products, is not not in line with customer needs, is the market has been eliminated, so not only waste a lot of human and material resources, cost a lot of costs, but also missed the market.

Only in accordance with the perfect process of product production, in order to save costs, improve the quality of product production, to avoid the waste of blind production, so said that the process in die-cutting project management has this vital role.

Drawings Confirmation

1, to confirm whether the smooth mass production, the need for a wealth of on-site experience.

2, whether the material resources are guaranteed, to use commonly used. Do not use materials that are not procured or purchased well.

3, as far as possible to require customers to provide all 2D documents, to master the pro/e conversion map file skills.

4, to master AutoCAD and Adobe Reader basic operations, you can modify the drawings.

Process Analysis

1, to confirm the sample production and mass production of the specific process is reasonable.

2, to confirm the ease of the processing of parts, auxiliary positioning hole mode.

Product Quotation

1, proficient in understanding the price of raw materials, know the raw material price Management table of the disk position.

2, clearly know the cost of different processes are different: one processing and two processing, need to change their own bottom paper or face paper and other factors.

3, different customer relations, the price is slightly different (need to discuss with the market)

4, the quotation to the specific customer in the form of a ladder to report: 0~30k, 30~50k, 50~100k, 100~200k, 200~500k, 500~1000k, 1000k or more.

Project Communication

1, master the project schedule, reasonable arrangements and reply to the quotation and sample supply time, principle: Quotation within 24 hours, sample within 72 hours.

2, the product set change processing: Follow the above one, two, three processes.

3, the customer is required to provide updated project BOM at any time (there are all parts of the product name, material number, product, the quantity required for a single piece and other messages).

4, the quality of abnormal treatment.

Sample making

1, the correct drawings: the actual use of the material name specifications, detailed size description, the correct perspective and special instructions.

2, proficient in accordance with the different processes and workstation disassembly skills, to meet the final fitting assembly requirements, to make a correct and complete sample.

3, the development of 3 days of sample production plan, with the production of communication to confirm the sample needs of equipment and operation and cleaning personnel, to confirm their own correct after the packaging.

4, the new material sample period to track their own control of the arrival situation, and the supplier information collation, we must sign a quality agreement. Mass prenatal transfer of procurement.

Inspection report

1, please be responsible for the quality of the personnel measurement, and according to the measurement report, but they have to master all the required measurement methods and specific operations, if necessary, do their own.

Sample Courier

1, finishing samples and the required information after the package, fill out the Express order, notify the shipping personnel to contact The courier company Pickup.

2, The courier message in 24 hours to notify the customer concerned personnel, and should be within 8 hours after the time to confirm whether the customer received.

Seal Sample Information

1, good communication to provide time.

2, prepare the relevant information: SGS, material certification, material specifications, drawings, samples, inspection reports, cover.

3, arrange the relevant personnel to assist printing.

Process Guidance

1, the process guidance: there is no special parts, are in accordance with the uniform standards have been implemented: A, a die-cutting class B, two die-cutting class C, three times die-cutting class (with positioning hole) d, mesh class E, copper foil type F, protective film g, yellow Film and Pet h,Dome class, etc.

2, the project layout diagram: A large number of a single product must be provided.

Mould Making

1, disassembly mold Figure 2, quotation 3, mold time 4, quality

In fact, a completeDouble-sided adhesive die-cuttingProject is not a department of things, should be involved in all departments, in order to make a good product, probability stage, die-cutting engineers according to customer needs, the development of initial plans and budgets, die-cutting master on product feasibility analysis, finance department to carry out economic feasibility analysis, R & amp; d Department for technical feasibility analysis ... This has the ability to form a "closed-loop" successful die-cutting project!